
I got all the levels right and layed in a few stones only for it to pour down all night and half the day and stuff all the work from the previous day so I went inside and started the floor while it dried out.


Ella helping move furniture and vac the floor.

First long run of boards from the hallway through to the lounge.
No comments:
Post a Comment