Friday, March 26, 2010

March 24, 2010

Second fix has now started. I haven't posted much because a lot of it is just cleaning lots of little areas up. Doors, door frames and handles are all on. Skirtings are all cut and ready for the floors to go on.

Little windows have been installed above the hallway

Black window frames in the hallwall have also been installed. I like the way the black looks against taun posts.
Front door and side window frames installed. All glass t come this week. Looking forward to seeing the louvers.

No comments:

Post a Comment