Big day today, electrical and plumbing started, as well as all the windows are on the two end buildings and the cladding started on the front building. Also gutters went up in the front section and all the bottom trims went on.

Blocked in underneath behind stairs and storage, soon to be black.

The corner window at te top of the stairs.

The back wall finished.

The back room finished.

The toilet window.

The bathroom corner window.

Outside inc wall on front section.

Woodland grey wall facing neighbours.

Inside lounge wall with windows installed.

Window above kitchen.