Friday, April 17, 2009

April 18, 2009

Earthworks and levels continue - view from the main bedroom. The 3 sheds should be blocked by the house leaving only treetops.



Moving more dirt for the 1.4m tall retaining walls. The flat level above still need to be raised 200mm and then the slab should be another 200mm from that.