Friday, March 26, 2010

March 24, 2010

Second fix has now started. I haven't posted much because a lot of it is just cleaning lots of little areas up. Doors, door frames and handles are all on. Skirtings are all cut and ready for the floors to go on.

Little windows have been installed above the hallway

Black window frames in the hallwall have also been installed. I like the way the black looks against taun posts.
Front door and side window frames installed. All glass t come this week. Looking forward to seeing the louvers.

March 20, 2010

Looking towards the kitchen, all walls are flushed and ready to paint.


The back stairs from the laundry, just need paint.

View looking over next doors roof from main bedroom.

March 4, 2010

Middle roof has been clad with bamboo reeding , this will be then covered with polycarb roofing.
The reed is to filter the light out more than the polycard will do and make the area seem more natural. It also creates nice shadows in the walls.


Looking out from Ella's bedroom.

Through the bi-fold doors and onto the smaller enclosed deck.

Looking through te hallwall out into the open deck.

March 3, 2010

Middle section is going up really starting to look like how we pictured it. The two industrial buildings like by a natural walkway.

The roof frame.

Thursday, February 25, 2010

February 25, 2010

The middle section going up, and the front door tomain deck pathway done.

Pathway with beams.

The main frame beams for the middle section.

The back end of the house with no scaffolding.


The beams for the middle section

No scaffolding and the zinc insert above the window.


Last shot of the scaffold.



February 23, 2010

Bamboo reeding on walkway overhang. It will be covered with polycarb roofing.


The flushing has started.



February 22, 2010



The wood for the middle section. All sanded and oiled.

The verandah for the walkway from the front door to the deck.